Iranshahr Power Plant

  • Client: Iran Power Development CO
  • Project location: Iranshahar,Iran
  • Design start date: 2009 Jan
  • Construction start date: 2013 Jan
Iranshahr Power Plant

Services:

Engineering

EPC Constarctor:

Boland Payeh company

Project status up to now:

Completed

Specifications:

 Iranshahr Combined Cycle Power Plant also known as Bampour Power Plant with the capacity of 740 MW is one of the biggest power plants in Iran. This power plant has two separate PARTSts, one gas unit and combined cycle unit. The Gas Power Plant with the capacity of 256 MW includes four 64 MW gas units built by Ashkouda? And the Combined Cycle Power Plant with the capacity of 484 MW includes two 162 MW gas units and one160 MW steam unit in an area of 48 acres. The main fuel for this power plant is natural gas and the secondary fuel is gasoline. Construction of the 60’000 m3 strategic concrete fuel tanks located in the thermal power plant, which provides some of the fuel needed for the power plants and their development and ultimately leads to creating job opportunities for the people of Sistan-o-Balouchestan, has been started by Bolandpayeh.TTBP accepted responsibility of engineering and arranged a group of well experienced Iranian structural engineers to follow the highest international standards in this specific and strategic project. The executive process of this project was started on Mar., 2009 and in late 2011 was completed.