Tajiat 4 Star Hotel

  • Client: Ministry Of Youth & Sport
  • Project location: Bagdad,Iraq
  • Design start date: 2012 Dec
  • Construction start date: 2016 Jan
Tajiat 4 Star Hotel

Services:

Engineering

EPC Constractor:

Bolandpayeh CO

Project status up to now: 

Under Construction

Specifications:

The 4 star hotel is located in the Bagdad athletic city, as one of the contract scope assigned on Dec., 2011 and has been considered to use for players , coaches and referees in competition time. The total area is about 5500 sq. meter in 3 stories. The main aim of conceptual design of the hotel is using the philosophy of minimalism, a modern hotel with a traditional feeling. It aims to put vernacular ornaments of Bagdad’s traditional houses at the heart of the hotel’s façade. While organizing the hotel layout into 70 rooms and suites, restaurants and bars, the underlying aim of the architect was always to create a veritable window to the outdoors and the site. In common with all TTBP projects, the architecture team set aside plenty of time for research in order to understand and immerse themselves in the site.